Pre-Construction
Successful projects depend upon the early involvement of critical team members. Proper execution of the pre-construction phase provides timely commencement and an efficient process.
  • Constructability Review
  • Preliminary Budgeting
  • Site Logistics Review
  • Preliminary Scheduling
  • Evaluation of Alternatives
  • Value Engineering
  • Design Team assembly and management
  • Subcontractor Prequalification
  • Subcontractor Procurement
  • Permit Procurement
  • Guaranteed Maximum Price Contracts
Design-Build
Design-Build reduces delivery time and insures on budget planning. The Owner hires the General Contractor as a single point of contact and accountability on every aspect of the project. Design-Build has many advantages. It shortens the duration of the pre-construction phase by providing actual and dependable pricing in early. With Design-Build having the General Contractor readily on board, commencement of construction may begin upon receipt of the appropriate permits. In many cases, some initial phases of construction may begin while final design is pending.

Design-Bid-Build
Design-Bid-Build, is a traditional method of project delivery. Typically, the Owner contracts an architect and engineer to produce technical drawings by which bids are solicited.

General Construction
Bannerman Contracting Company provides a full array of project services such as general maintenance & repair, demolition, rough & finish carpentry, framing & drywall, insulating, acoustical ceilings, painting & wallcovering, flooring, concrete, roofing, landscaping and doors & window systems.

Post-Construction
Post-Construction services are critical to the process. Through post-construction services, the general contractor insures functionality and satisfaction.
  • Pre-Occupancy walk-through
  • Systems turnover and operations training
  • Warranty documentation
  • Operations and maintenance manuals
  • As built plans archiving
  • Warranty maintenance
  • One year walk-through meeting